Blog · 18 notes

All field notes

Every HQ Supply Chain field note in one place. Search by topic, product or keyword.

Search the archive

18 notes

How to source in China without losing the product brief

A practical sequence for turning product intent into supplier actions, sample decisions and an approval record the rest of the chain can use.

A supplier shortlist is not a supplier decision

What to compare after the first quote: sample quality, production fit, communication, traceability and the risks that price alone hides.

Define the inspection before the cartons arrive

A quality check becomes useful when the approved sample, tolerance, method and release decision are agreed before inventory moves.

Inventory visibility starts before the dashboard

Available, in inspection, reserved and in transit are different operating states. Treating them as one number creates avoidable promises.

The order check belongs before the box is sealed

A simple operating pattern for connecting SKU identity, quantity, inserts and packaging requirements to the final dispatch decision.

Packaging is a handoff, not the final decoration

How product protection, presentation, labeling and transport conditions need to meet in one packaging brief.

DDP is a responsibility map, not just a shipping price

A plain-language way to ask who owns freight, duties, customs information and delivery exceptions before approving a route.

Track the milestone that can still change the outcome

More status updates do not always create more control. Focus on the handoffs where a delay, document or route decision still matters.

A return needs a disposition, not just a tracking number

Inspect, recover, restock or resolve: the useful part of a returns process is the decision made after the item comes back.

What a sample approval should record before production

A sample answers a specific question. Recording which question, and which deviations were accepted, is what makes the approval usable later.

A supplier scorecard that survives a price negotiation

Score the evidence — delivery, defects, response, documentation — and fix the weighting before the comparison starts, not after it ends.

Sorting cosmetic defects from release blockers

Decide the consequence classes before the inspection, so the report arrives with a decision instead of a question.

Name the stock states before you promise a date

In production, in transit, in inspection, released or reserved — the difference between owning stock and being able to sell it is a state.

Plan the peak by handoff, not by volume

Peak season does not strain every step equally. Find the handoff that fills up first and plan the labour and rules around it.

Kitting turns one order into many failure points

A kit is a controlled bill of components plus a check before sealing. Without both, the customer finds the mistake.

The freight handover is a document, not a phone call

Every freight problem is a handover problem. Fix the cut-off, the documents and the owner in one place.

Customs documents fail on the small fields

Consistency between invoice, packing list and declaration matters more than any single document being perfect.

Return recovery starts with the disposition code

The code assigned when the parcel is opened decides whether the unit is restocked, recovered or written off.

Bring us the handoff that is slowing the chain down.

Start the conversation